Traffic Alert

7 November 2014

  

Changed traffic conditions along Great Ocean Road

VicRoads advises that road works at various locations along the Great Ocean Road continue throughout November 2014, weather permitting.

Vegetation trimming

VicRoads' contractors will continue to trim vegetation behind guard rails, including mulching and cleaning debris off the road, at the following locations:

  • Radfords Road – Old Peterborough Road
  • Gellibrand Lower – Lavers Hill
  • Evans Road – Glenaire
  • Horden Vale Road – Cape Horn
  • Marengo – Apollo Bay
  • Wongarra – Cape Patton
  • Reedy Creek – Big Hill
  • Big Hill – Cinema Point
  • Cinema Point – Fairhaven
  • Anglesea – Torquay
Retaining wall

VicRoads' contractors will be building a new retaining wall at Moonlight Heads, near Yuulong from Monday 10th November until Friday 28th November.  These works are to provide support to the road and prevent road movement.

Road repair works

VicRoads' contractors will be rebuilding, resurfacing and patching sections of the road close to Skenes Creek, Moggs Creek, Spout Creek and Bellbrae roundabout throughout November.

Changed traffic conditions

Speed will be reduced during the works and traffic will be reduced to a single lane in each direction.  These reduced speed limits are aimed at ensuring the safety of both road workers and road users.

Motorists are encouraged to plan their journey and allow for extra travel time, as minor delays are expected.  VicRoads thanks drivers for their patience.

More information

For more information about the upgrade programme, please see here.

apollo bay radio

bluebrowncustomgreenorangepinkredturquoiseyellow